← Back to OnderVolk

Every trade. Every starter board. One field-first OS.

Pick a trade to see the modules that come pre-pinned to its workbench, the helpers you can layer on, and the secondary trades that pair naturally.

Landscaping

3+2

Site walks, planting plans, and crew sequencing for green-side work.

  • · Site Walk Planner
  • · Material Estimator
  • · Maintenance Routes

Open workbench →

Electrical

3+2

Loads, circuits, permits, and inspection-ready paperwork.

  • · Load Calculator
  • · Circuit Planner
  • · Permit Tracker

Open workbench →

Plumbing

3+2

Rough-ins, fixture counts, and service calls without the spreadsheet hunt.

  • · Fixture Take-off
  • · Service Dispatch
  • · Drain Camera Log

Open workbench →

HVAC

3+2

Loads, equipment matchups, and maintenance plans that pay annually.

  • · Manual J Snapshot
  • · Equipment Matchup
  • · Maintenance Plans

Open workbench →

Carpentry / Framing

3+2

Lumber take-offs, framing schedules, and punch lists that close jobs.

  • · Lumber Take-off
  • · Framing Schedule
  • · Punch List

Open workbench →

Painting

3+2

Square-foot pricing, prep schedules, and color schedules that survive the job.

  • · Square-foot Pricing
  • · Color Schedule
  • · Prep Checklist

Open workbench →

Roofing

3+2

Tear-off pricing, material kits, and weather windows that hold the schedule.

  • · Tear-off Pricing
  • · Material Kits
  • · Weather Window

Open workbench →

Concrete / Masonry

3+2

Yardage, forming, and pour-day logistics without the napkin math.

  • · Yardage Calculator
  • · Forming Schedule
  • · Pour-day Board

Open workbench →

General Contractor

3+2

Multi-trade jobs, sub coordination, and draw schedules that keep cash flowing.

  • · Sub Roster
  • · Draw Schedule
  • · RFI Log

Open workbench →

Asphalt Paving

3+2

Tonnage, sealcoat schedules, and striping plans for parking lots and drives.

  • · Tonnage Calculator
  • · Sealcoat Schedule
  • · Striping Plan

Open workbench →

Solar Panel Installation

3+2

System sizing, AHJ paperwork, and inverter commissioning, ready for inspection.

  • · System Sizing
  • · AHJ Paperwork
  • · Commissioning Log

Open workbench →

Fire Protection / Sprinkler Systems

3+2

Hydraulic calcs, inspection routes, and AHJ submissions on a single board.

  • · Hydraulic Calc
  • · Inspection Routes
  • · Deficiency Tracker

Open workbench →

Pest Control

3+2

Routes, treatments, and recurring service plans that keep customers covered.

  • · Treatment Plans
  • · Route Board
  • · Chemical Log

Open workbench →

Secondary trades · 23

Layer one on top of any primary trade.

Secondary trades add a focused module pack to your workbench without changing the primary layout.

HardscapingIrrigationDrainage / GradingLandscape LightingSecurity Systems / Low VoltageCabinetry / MillworkFencingTree ServiceTile SettingDrywall / Interior FinishingFlooringWeldingPressure WashingGuttersInsulationDemolitionGlass & Mirror / GlazingMetal FabricationWaterproofing / SealantsConcrete Cutting / CoringSoundproofingSignage InstallationWindow Treatments / Blinds